AJA Target Change Schedule
Each chamber may only accommodate 4 deposition materials at once.
A target change schedule is in place to address the diverse deposition needs of lab members in an equitable and transparent manner.
NOTES:
- Target positions P1 & P2 in each chamber will generally remain fixed.
- Target positions P3 and/or P4 in each chamber will be changed out on a week-by-week basis as a function of target change requests received in any given week.
- Equipment users authorized to independently operate the AJA-sputter system may submit a target change request via the TARGET CHANGE REQUEST FORM (login required).
- Target change requests for any given week must be received no later than 12-noon on the preceding Thursday.
- Requests will be processed on a first-come first-served basis.
- Requested targets will be installed by 4PM on the Friday after the Thursday 12-noon request deadline.
- Target materials available:
- Chamber 1 (conductors): Al, Al 1%Si, Cr, Fe, ITO, Nb, Ni, Ti, W, Au, Xuser
- Chamber 2 (insulators): Al2O3, MgO, SiO2, TiO2, AZO (2% Al), ITO, Xuser
- Requested targets will remain in place:
- for 1 week, until 12-noon of the following Friday after the target's initial installation.
- The target(s) may be permitted to remain in place for longer if no new requests are received in subsequent week.s
- User-owned targets are identified as "Xuser" in the table.
Chamber 1 - conductors |
Chamber 2 - insulators |
|||||||
---|---|---|---|---|---|---|---|---|
PERIOD |
P1 | P2 | P3 | P4 |
P1 |
P2 |
P3 |
P4 |
Install May 2 | Nb | Ti | Au | Cr | ITO | SiO2 | STO | Al2O3 |
Install May 9 | Nb | Ti | Au | Cr | ITO | SiO2 | STO | Al2O3 |
Install May 16 | Nb | Ti | Au | Cr | ITO | SiO2 | STO | Al2O3 |
Install May 23 | Nb | Ti | Au | Cr | TiO2 | SiO2 | STO | Al2O3 |
Install May 30 | Nb | Ti | Au | Cr | ITO | SiO2 | STO | Al2O3 |
Install June 6 | Al | Ti | Au | Ta | ITO | SiO2 | Si | TiO2 |
Install June 13 | Al | Ti | Au | Nb | ITO | SiO2 | Si | STO |
Install June 20 | Al | Ti | Au | Nb | ITO | SiO2 | Si | STO |
Install June 27 | Al | Ti | Au | Cr | ITO | SiO2 | Si | STO |
Install July 4 | Nb | Ti | Au | Cr | ITO | SiO2 | Si | STO |
Install July 11 | Nb | Ti | Au | Cr | ITO | SiO2 | Si | STO |
Install July 18 | Nb | Ti | Au | Cr | ITO | SiO2 | Si | Al2O3 |
Install July 25 | Nb | Ti | Au | Cr | ITO | SiO2 | Si | TiO2 |
Install Aug 1 | Nb | Ti | Au | Cr | ITO | SiO2 | Si | TiO2 |
Install Aug 8 | Nb | Ti | Au | Cr | ITO | SiO2 | Si | TiO2 |
Install Aug 15 | Al | Ta | Au | Cr | ITO | SiO2 | Si | TiO2 |
Install Aug 22 | Al | Ta | Au | Cr | ITO | SiO2 | Si | TiO2 |
Install Aug 29 | Al | Ta | Au | Cr | ITO | SiO2 | Si | TiO2 |
Install Sept 5 | Al | Ta | Au | Cr | ITO | SiO2 | Si | Al2O3 |